Real Estate

Permit Automation Platform

Connects your design model, permit system, and financial model. Flags compliance issues on change and recalculates financial impact automatically.


The Problem

Approval cycles average 10–14 months. Most of that is correction loops.

Each design change triggers a manual round-trip between architect, permit consultant, and finance. Most projects go through it six or more times.

12 → 4 mo

Approval cycle

~$2M saved per project

$10–20k

Per correction cycle

Eliminated before submission

$250k/mo

Cost of each delay

On a standard mid-rise


The Platform

What the platform does

Six modules covering the points in the permit workflow where manual coordination currently happens.

01

Zoning check on model change

Runs compliance checks against current bylaws each time the Revit/IFC model changes.

02

Municipal data sync

Permit status and bylaw updates pulled from CivCheck and Accela automatically.

03

Financial recalculation

Linked Excel or Argus model updates when a design or regulatory parameter changes.

04

Constraint alternatives

When a design fails a rule, returns ranked compliant alternatives with cost and schedule impact.

05

Community risk brief

Objection history and blocking patterns by address, sourced from prior submissions at the same site.

06

Shared planner session

Developer and city planner edit model parameters together and see compliance results update live.


Who It's For

Who it's for

Development PMs at mid-to-large firms with active permit submissions.

01

Active pipeline

Mid-rise or mixed-use with live permit submissions.

02

Long approval cycles

Multiple correction rounds before first compliant submission.

03

Consultants managing corrections

Architects or permit consultants coordinating between design, compliance, and finance.


Interested in a pilot?

Early pilot with teams on active pre-submission projects. Book a call to see if it's a fit.

Book a call

Mosaic

Embedded intelligence.


© 2026 Mosaic. All rights reserved.